Sharpex Engineering Works

Installation of 14.175 kW capacity solar project was done at our industrial client location, total 6 days taken to execute full installation of Solar Power Project at their Odhav – GIDC location.

Total Capacity of Project:

15 kW

Surface Area:

140 sqmtr

Peak Power Generation:

81.1 Unit Per Day

Work Completion Duration:

6 Days

Location:

Odhav, Ahmedabad – Gujarat.

Finishing Process

Total 6 days of process executed after design of Solar Project Installation.

Project capacity of total 15 kW generated with this EPC Installation.